DESIGN SUPPORT SERVICES

  • Schematic Design to Construction Documentation
  • Code Compliance Analysis
  • Delivery Systems Standardization
  • Shop Drawings & Built Drawings
  • Paper to CAD Conversion
  • 3D Visualization
  • Shop drawings & As-Built drawings

Design Support Services

BUILDING INFORMATION MODELING

  • Creating BIM model from sketches, CAD drawings etc.
  • Generation of study model for volumetric design analysis
    and conflict detection
  • Creation of virtual product library of building products with
    manufacturer specs
  • Extraction of quantities, schedules, cost estimation and area
    charts from the model
  • Documentation for all design stages
  • Renderings and Animations
  • Integrated Project Delivery using BIM - Design, Construction,
    Facility management

building information modeling

VIRTUAL DESIGN & CONSTRUCTION

  • Virtual building modeling from 2D drawings
  • Model enrichment of existing models with construction
    specific information
  • Cost Modeling & Estimation
  • Analysis models for trade coordination, conflict resolution
    and sequencing
  • Option Study – Analyze ‘what-if’ scenarios
  • As-built Modeling & Documentation

Virtual Design Construction

BIM + GREEN

  • Building Performance Evaluation
  • LEED Facilitation
  • Creating Building Simulation Models using Autodesk Green Building
    Studio, ECOTECT and IES

Bim + Green

DESIGN MANAGEMENT SERVICES

  • Design Coordination Services
  • Design Localization Services
  • Design Documentation Services
  • BIM Management Services

Design Management Services

BIM is a process!

Posted by Carol Parker On 4:52 AM 0 comments

B
IM is a process, not a thing and not software, even though certain BIM software vendors would like you to think that their products ARE the only true way to BIM. The term is Building Information Modeling, not Building Information MODEL. It is a verb -- Modeling for Building Information. Therefore, if an architect uses the BIM process to derive faster, more accurate, complete and integrated CDs, then he is leveraging the BIM process by creating a "virtual building model" to deliver his part of the design/build/operate process - and in most cases that is paper drawings.

But more and more owners and contractors want the virtual building model from which the CDs are derived. And yes, one day I believe we will be submitting BIMs to building departments to get approval; it will happen. The process of electronic code checking and BIM quality validation is already possible today, with software like Solibri. For now, we need paper...but my point is, architects can at least get to paper information better and faster via the BIM process. 



Contractors want the virtual building model from the BIM process primarily for MEP Coordination and if they don't get it from the architects, they will often pay thousands of dollars to a third party to create a "constructability" model from 2D drawings, since MEP Coordination in 2D using light tables is a HUGE headache (meaning it wastes time and money) for contractors. Contractors are also beginning to use the constructability model for construction sequencing (4D building "dress rehearsals" e.g practicing building the building and doing virtual "what ifs") and project management, making them flawless when it comes time to really build the building. Extracting accurate estimates from the virtual building model follows as third priority in the contractor's use of BIM. 



At this stage in the Building Industry transformation, I suggest we focus on how any or all stakeholders can leverage models from the BIM process however they can. Even though there are many models now, one day we will reach the Holy Grail of one integrated Virtual Design and Construction (VDC) model that travels downstream and picks up the necessary level of detail (LOD) as it chugs down the design/build/operate track. Then, we will not need to talk about BIM anymore, because we will all be doing it! 

Right now, all stakeholders are doing the best they can to leverage a virtual building in any way they can, and as we progress it will all become even more integrated, as IPD and design/build becomes the norm. 



Until that time, BIM continues to be a verb, and it is progressing!

| | edit post

Cooled Cycling Infrastructure

Posted by Carol Parker On 4:54 AM 0 comments

A cycling project which Qatar’s sovereign Emir Hamad bin Khalifa al Thani has proposed to promote the health of his people. After all, a large proportion of the population suffers from problems brought on by prosperity: they do not get enough exercise, cardiovascular diseases are prevalent and children are obese. This is a prestigious project with Qatar as an example to the countries in similar conditions!

For people in Qatar cycling is not at all the obvious thing to do. This needs to be changed as the 30 kilometer cycle path - now designed - is to be completed within a year after the signing of the contract. An attendant problem is the fact that Qatar’s climate is intensely hot and humid. The project group therefore came up with the idea of cooling the entire cycle path using cold ground water. 
 
The American consultancy firm the Rand Corporation has been leading in advising the Emir on the realization of his goal of getting Qatar’s population to cycle.
VeloMondial played a major role in the realization of the cycle path and proposed to involve the Dutch firm Goudappel Coffeng for the technical aspects. Another Dutch firm Akertech was involved in preparing the technical drawings.
| | edit post

ARCHiGENESIS - New Marketing Flier :-)

Posted by Carol Parker On 1:53 PM 0 comments

| | edit post

About Me

My photo
I'm a Business Development Manager with ARCHiGENESIS, Inc. focused on understanding the specific requirements of clients and offering them solutions tailored to achieve the desired results.